Centre for Construction Development and Research(CDR)
| S/N | Title | Remarks |
|---|---|---|
| 1 | Effectiveness of Different Repair Systems for repair of Corrosion Damaged Structures | |
| 2 | Cost Effective Technology for Low Traffic Volume Concrete Roads | |
| 3 | Development of Accelerated Mix Design Method for Concrete using PPC or Fly Ash with OPC | |
| 4 | Development of Geopolymer Concrete for Application in Pavements and Precast Concrete Construction | |
| 5 | Development of Ultra High Performance Concrete (UHPC) - Including use of Nano Technology for UHPC | |
| 6 | Enhancing the Utilization of Construction & Demolition Waste and Other Waste Based Aggregates in Concrete Structures and Pavements | |
| 7 | Effect of Supplementary Cementitious Material (SCM'S) (Single and Multi Blends) on Service Life of Concrete Structures-Including Studies to Improve Green Cements to Meet Durability/Service Life Requirements | |
| 8 | Model Low Cost Housing Sustainable Technology For Mass EWS & LIG/MIG Housing Schemes Using Precast/Prefab Systems with Emphasis on Maximization of Waste Based Materials | |
| 9 | Experimental Study on Shear and Compression Design of High Strength Concrete Including Effect of Fibre on Enhanced Durability and Fire Resistance | |
| 10 | Performance Evaluation of M40, M60 & M80 Grade High Performance Fibre Reinforced Concrete for Performance Improvement of Concrete Structures | |
| 11 | Development of Alternatives to Natural Sand for use in Concrete Masonry/Plaster | |
| 12 | Development of Guidelines for Design of High Performance Concrete Mixes for long Service Life using latest available Ultrafines and Admixtures | |
| 13 | Development of Design Parameters for High Strength Concrete | |
| 14 | Development of Methods for Service Life Design of Concrete Structures |
| S/N | Title | Remarks |
|---|---|---|
| 1 | AAR Test using "Accelerated Mortar bar as per ASTM C1260" on Tunnel Excavated Rock for Appurtenant Work (other than Main Structure) | SJVN Limited, Naitwar-Mori Hydro Electric Project, Mori, Distt, Uttarkashi, Uttarakhand |
| 2 | Additional Work for Evaluation of Cement and Potential Alkali-Aggregate Reactivity as per ASTM C1293 | THDCIL Tehri Dam Project, Bhagirathipuram-Tehri, Uttrakhand |
| 3 | Third Party Quality Assurance/Audit for Work of "C/o Multilevel Parking cum commercial Complex Building at Krishna Nagar in Ward No. 229 Shah-S Zone" | Executive Engineer (Pr-I) Shah-S, East Delhi Municipal Corporation, Krishna Nagar, Delhi |
| 4 | Evaluation of Rock Sample for Concrete Construction Works Purpose for Source Approval for M/s Larsen & Toubro Limited | Larsen & Toubro Limited, Panchali Khurd, Meerut Bypass, Meerut |
| 5 | Performance Evaluation study on Microfiber in PPC as per IS: 1489(1)-2015 | M/s Nuvoco Vistas Corp. Ltd, Bhiwani Cement Plant, Village- Chirya, District- Charkhi- Dadri |
| 6 | Creep Test of Concrete up to 180 days as per ASTM C512 | NUVOCO Vistas Corp. Ltd., Formerly Lafarge India Limited, World One Project, Lower Parel, Mumbai |
| 7 | Condition assessment and Recommendation on Repair & Restoration/ Strengthening measures of various RCC Structures at NTPC Kahalgaon, Stage-I, | NTPC Limited, Kahalgaon Super Thermal Power Project, Kahalgaon, Bhagalpur, Bihar |
| 8 | Condition assessment and recommendations on Remedial Measures of RCC Structure of Over Head Tank (OHT) at Tihar Jail, New Delhi | Assistant Engineer-I, Public Wworks Department, West Building, Sub Division-II, Tihar Jail, New Delhi |
| 9 | Testing of Ground Granulated Blast Furnace Slag (GGBFS) | JSW Cement Limited, JSW Centre, Bandra Kurla Complex, Bandra (East) Mumbai |
| 10 | Third Party Quality Assurance / Audit for Work of "Construction of Academic Block for 2nd Campus of North Orissa University, Baripada at Suleikhamar in the District of Keonjhar". | The Division Head, Jajpur Division, Odisha Industrial Infrastructure Development Corporation, OIIDC, Jajpur, Odisha |